It all begins with an initial face to face, site meeting to discuss your garden room whereupon we'll provide you with a quotation (no obligation). Following agreement in principal, we finalise your designs to your specification.  A 50% deposit is paid to secure your order and book your Room into our schedule.

Installation

Below is a typical installation schedule however the Scottish weather rarely follows such a typical prediction, therefore, we advise an element of flexibility be allowed for.

Our kits are delivered to your site in our vehicles and all we ask is that clear access to the site is provided for all the panels to be brought in.

Week One

Ground screw foundations laid, then the base frame is fixed in place. The floor is insulated and damp proofed then the walls are erected on top of the base. The building is fully wrapped in an insulating foil membrane, plus a waterproof breathable membrane, then the single piece rubber membrane is applied to the roof.

  • Base
  • 2.GardenRoomWalls
  • Insulated GardenRoom

Week Two

The doors and windows are installed ready for the internal finishes and final external cladding. 

  • BlackMembrane_Glazing
  • Abbeyfield3

Week Three

Internally the room is fully insulated, floored, painted and decorated and all electrics completed. General finish, sign off

  • Abbeyfield3